3 edition of American River Pump Station Project Transfer Act of 2007 found in the catalog.
American River Pump Station Project Transfer Act of 2007
United States. Congress. Senate. Committee on Energy and Natural Resources.
Published
2007
by U.S. G.P.O. in [Washington, D.C
.
Written in
Edition Notes
Series | Report / 110th Congress, 1st session, Senate -- 110-119 |
The Physical Object | |
---|---|
Pagination | 6 p. ; |
ID Numbers | |
Open Library | OL14562358M |
OCLC/WorldCa | 156908061 |
• Ongoing construction efforts for the American River Pump Station • Reclamation’s management of nea acres of land in the Klamath Project • Humboldt Project Title Transfer Environmental Impact Study in the Lahontan Basin Project water and power users under the Central Valley Project Improvement Act (CVPIA). The estimated. The American River project, on Rubicon River, Silver Creek, and the South Fork of the American River near Placerville, Calif., is undergoing relicensing. SMUD filed a settlement on behalf of itself and others in relicensing proceeding Feb. 1. Brookfield Power expands hydro plant portfolio.
American River Pump Station Project The costs of the American River Pump Station Project are non-reimbursable pursuant to Public Law SEC. –May 8, Therefore, the amount previously included in Storage construction has been adjusted to exclude these costs. American Recovery and Reinvestment Act (ARRA). North Fork American River). PCWA’s water rights allow for the diversion of up to 40 cubic feet per second (cfs) fr om Canyon Creek; • PCWA’s operation of the American River Pump Station diverts water from the North Fork American River near the city of Auburn to provide up to 35, acre-.
Transfer ownership of the American River Pump Station Project located at Auburn, California, to the Placer County Water Agency (H.R. ) Authorizes the Bureau of Reclamation to conduct a feasibility study, include an environmental evaluation and a cost allocation, on raising the height of the Arthur V. Watkins Dam to allow for additional water. American River Pump Station - Completes construction of the replacement pumping facility for Placer County Water Agency, temporarily closing the Auburn Dam diversion tunnel, and restoring the river channel. The decrease is due to project closeout and contract completion. ,
Feb 7, H.R. (th). To direct the Secretary of the Interior to transfer ownership of the American River Pump Station Project, and for other purposes.
Ina database of bills in the U.S. Congress. H.R. ( th): American River Pump Station Project Transfer Act of React to this bill with an emoji Save your opinion on this bill on a six. To direct the Secretary of the Interior to transfer ownership of the American River Pump Station Project, and for other purposes.
Short title. This Act may be cited as the American River Pump Station Project Transfer Act of 2. Authority to transfer. Get this from a library. American River Pump Station Project Transfer Act of report (to accompany H.R.
[United States. Congress. Senate. Committee on Energy and Natural Resources.]. H.R. American River Pump Station Project Transfer Act of Cost Estimate. Cost estimate for the bill as ordered reported by the Senate Committee on Energy and Natural Resources on View Document KB.
Summary. American River Pump Station Project Transfer Act of - Directs the Secretary of the Interior to transfer ownership of the American River Pump Station Project located at Auburn, California, to the Placer County Water Agency.
Makes federal costs associated with construction of the Project nonreimbursable. American River Pump Station Project Transfer Act of As ordered reported by the Senate Committee on Energy and Natural Resources on H.R.
would direct the Secretary of the Interior to convey certain federal land and a water. Get this from a library. American River Pump Station Project Transfer Act of report (to accompany H.R. ) (including cost estimate of the Congressional Budget Office). [United States.
Congress. House. Committee on Resources.]. Auburn Dam was a proposed concrete arch dam on the North Fork of the American River east of the town of Auburn, California in the United States, on the border of Placer and El Dorado Counties.
Slated to be completed in the s by the U.S. Bureau of Reclamation, it would have been the tallest concrete dam in California and one of the tallest in the United States, at a height of feet ( H.R. (th): American River Pump Station Project Transfer Act of H.R.
(th): Water Resources Research Act Amendments of H.R. (th): To designate the facility of the United States Postal Service located at Gateway Drive in Lincoln, California, as the “Beverly J.
Wilson Post Office Building”. The Department supports H.R.a bill to transfer ownership of the American River Pump Station Project to Placer County Water Agency (PCWA) upon completion of construction. The American River Pump Station replaces a permanent pumping plant constructed by PCWA in the late ’s on the North Fork of the American River.
Tumalo Water Conservation Project Act of Juab County Surface and Ground Water Study Development Act of American River Pump Station Project Transfer Act of Arthur V.
Watkins Dam Enlargement Act. Sec. American River Pump Station Project transfer. Sec. Arthur V. Watkins Dam enlargement. Sec. New Mexico water planning assistance. Sec. Conveyance of certain buildings and lands of the Yakima Project, Wash-ington.
Sec. Conjunctive use of surface and groundwater in Juab County, Utah. Sec. American River Pump Station Project Storage capital has been adjusted in the final rates to reflect the American River Pump Station Project as non-reimbursable pursuant to Public Law SEC.
–May 8, American River Pump Station Project Transfer Act of report (to accompany H.R. ) (including cost estimate of the Congressional Budget Office).
United States. Congress. American River Pump Station Project Final Environmental Impact Statement/Environmental Impact Report - Appendix C Volume 2 (June ) Ruling Dated Febru PCWA American River Pump Station Project Final Environmental Impact Statement/Environmental Impact Report - Appendix D (June ) Ruling Dated Febru PCWA May 8, S.
(th). A bill to authorize certain programs and activities in the Department of the Interior, the Forest Service, and the Department of Energy, to implement further the Act approving the Covenant to Establish a Commonwealth of the Northern Mariana Islands in Political Union with the United States of America, to amend the Compact of Free Association Amendments Act.
project, and was involved in the state and federal ESA compliance activities. She led resource agency coordination and consultation efforts with the U.S.
Fish and Wildlife Service, National Marine Fisheries Service, and California Department of Fish and Game. Key environmental resource issues for the project included lower American River fisheries. H.R. (Doolittle), To direct the Secretary of the Interior to transfer ownership of the American River Pump Station Project.
Senate Energy and Natural Resources Committee (Domenici) William E. Rinne, Acting Commissioner, Bureau of Reclamation. Jason Peltier, Deputy Assistant Secretary for Water and Science. Jun. 27, American River Pump Station Project Transfer Act: 7-Feb: H RES On Motion to Suspend the Rules and Agree: P: Recognizing the African American spiritual as a national treasure: 7-Feb: H R On Motion to Suspend the Rules and Pass: P: Methamphetamine Remediation Research Act: 6-Feb: H R On Motion to Suspend the Rules and.
American River Pump Station Project Storage capital has been adjusted in the final rates to reflect the American River Pump Station Project as non-reimbursable pursuant to Public Law SEC.
–May 8, American Recovery and Reinvestment Act (ARRA) The ARRA legislation permits the reimbursable costs of O&M expenses funded.on the Middle Fork American River to EBMUD.
The transfer water would be released from the Permit expired on December 1, and on January 7,PCWA filed a petition for extension of time. The petition for extension of time is The MFP is a multi-purpose project designed to conserve waters of the Middle Fork American River.Middle Fork American River Project Reservoirs.
PCWA By the Numbers. Brochures. About PCWA. American River Pump Station. Middle Fork American River Project Recreation. Books. A Heritage of Water: A Golden History of PCWA A Golden History of PCWA Awards and Dedications.
Board of Directors. Construction. Events.